Bathroom resealing, 2 hours
Old silicone removed around the bath, shower and basin, mould treated, new mould-resistant seal.
Shelves, curtain rails, door handles, a dripping tap, furniture to assemble: a list of small jobs in one visit.
Write your list when you book, with photos if you can: the handyman brings the right tools and common fixings. Parts you choose (a new tap, a curtain rail) are bought by you or added at cost with the receipt. We drill concrete walls only within the building's permitted hours. No gas work and no fixed electrical wiring: these need registered professionals.
• Duration: 1 or 2 hours • Parts: At cost, with receipt • Good to know: No gas, no fixed wiring
Flexible 24 h
Bamboo Ladder, Kwun Tong, Hong Kong